Case Study — 06
Data Centre PowerInfrastructure
- Client
- Confidential Technology Company
- Location
- Kampala, Uganda
- Year
- 2025
- Sector
- Data Centres
0.3300° N, 32.5700° E
01
Challenge
A growing colocation facility needed to guarantee concurrent maintainability — the ability to service any power component without dropping a single server rack.
02
Approach
We designed a dual-path A/B power architecture from utility intake to rack PDU, with independent UPS strings, redundant distribution, and a monitoring layer instrumenting every breaker and busbar.
03
Engineering Solution
The facility now runs true 2N power to every critical rack, with clean earthing and bonding throughout, real-time power monitoring, and documented failover procedures verified by live pull-the-plug testing.
Technical Scope
- UPS systems
- Power distribution
- Monitoring
- Grounding
- Redundancy design
Results
2N redundancy verified by live failover tests
100% uptime since commissioning
Per-rack power monitoring and capacity trending
Concurrent maintainability achieved